TSX-V: SRA $0.23
Change: -0.005
20 min. delay
3/10/2010 3:38pm PST
      
Tier 1 Overview
projects map

SGP currently has four projects in the Tier 1 stage of development - Silver Peak and Alum (Paymaster District), Reese River, and Barren Hills.

Tier 1 projects are properties that have had a significant amount of exploration drilling completed and are classified as at the pre-feasibility and production drilling assessment stage. The estimates provided have been constructed using independent geothermal consultants. All four of SGP's Tier 1 projects are located in close proximity to transmission infrastructure. Collectively, these four projects combined have the potential to generate between 150 to 350 MW. This would equate to enough electricity to supply power to 120,000 to 280,000 homes.

Tier 1 Projects
Project Location
Acres
km²
Alum Esmeralda, NV
7198
29.1
Barren Hills Lyon, NV
5154
20.9
Reese River Lander, NV
6145
24.9
Silver Peak Esmeralda, NV
7873
31.8
TOTAL
26,370
106.8
Landscape
Click on locations below for more detials